<journal article>
Design, Construction and Preliminary Test Operation of BPPT-3MW Condensing Turbine Geothermal Power Plant

Creator
Language
Publisher
Date
Source Title
Vol
Issue
First Page
Last Page
Publication Type
Access Rights
Crossref DOI
Rights
Abstract BPPT of Indonesia has developed 3MW condensing turbine type geothermal power plant (GPP) with maximum local content. The design of GPP is based on KMJ-68 well characteristic data of Pertamina Geotherm...al Energy located at Kamojang West-Java. KMJ-68 well data are; steam dominated, 12bara well head pressure, 1.7% NCG, 33ton/hour steam flow rate. The construction has been completed and is currently being operated for early stage performance testing. Until early 2018, the BPPT’s GPP has generated 15,572kWh of electricity, with the highest load of 1.3MW. The thermal efficiency of the turbine-generator system reaches 81% for loads of about 1MW.show more

Hide fulltext details.

pdf Pages_162-167 pdf 1.67 MB 1,044  

Details

PISSN
EISSN
Record ID
Peer-Reviewed
Subject Terms
Created Date 2019.07.09
Modified Date 2024.02.21

People who viewed this item also viewed