<紀要論文>
Early Step to Prevent Environmental Impacts in Mining Project

作成者
本文言語
出版者
発行日
収録物名
開始ページ
終了ページ
出版タイプ
アクセス権
関連DOI
関連URI
関連情報
概要 The purpose of the work is to show that an early data acquisition for environmental impact assessment is very important in mining operation. Study of the mineralogy, hydrochemistry, hydrogeological sy...stems, and groundwater flow modeling, showed that in the abandoned Messel Pit area soils and natural springs have indicated high arsenic content, and the high arsenic content in groundwater was dominantly caused by natural condition. Arsenic in Buyat Village's groundwater is believed originally coming from the oxidation of sulphide minerals (arsenopyrite) in the alluvial deposit. In the case of Sorowako Nickel Mine, high concentration of Cr^<6+> were found at ore stockpiles, open pit areas, and ex-pit ponds. With suitable data preparation and analysis, environmental impacts in mining operation could be managed and minimized. As a conclusion, environmental data acquisition for environmental impact assessment should be started during the early phase of mine development in line with the exploration program.続きを見る

本文ファイル

pdf p028 pdf 1.11 MB 291  

詳細

レコードID
査読有無
主題
ISSN
注記
登録日 2012.03.14
更新日 2023.11.22

この資料を見た人はこんな資料も見ています