<学術雑誌論文>
Economic Feasibility Study of E-Waste Recycling Facility in Egypt

作成者
本文言語
出版者
発行日
収録物名
開始ページ
終了ページ
出版タイプ
アクセス権
Crossref DOI
権利関係
概要 On a global scale, the high consumption of electric and electronic equipment (EEE) leads to mounting volumes of e-waste. The e-waste problem in Egypt is not very well assessed, so a feasibility study ...for an e-waste dismantling facility in Cairo is introduced in this research. This feasibility study aims to provide a guide to set up an economically viable e-waste recycling business by calculating the main costs and revenues of the recycling system taking into account the environmental standards. The profit and loss predictions showed that the facility would gain revenues of USD 708,659 after a 5-year of operation.続きを見る

本文ファイル

pdf p026 pdf 716 KB 887  

詳細

PISSN
EISSN
レコードID
査読有無
地域
主題
登録日 2018.07.13
更新日 2024.02.21

この資料を見た人はこんな資料も見ています