<学術雑誌論文>
A Stope Mining Design with Consideration of Hanging Wall When Transitioning from Open Pit Mining to Underground Mining for Sepon Gold Mine Deposit, Laos

作成者
本文言語
出版者
発行日
収録物名
開始ページ
終了ページ
出版タイプ
アクセス権
権利関係
権利関係
関連DOI
関連URI
関連HDL
概要 This study investigates the transition from surface to underground mining at the Sepon Gold mine. The stability of surface slopes is assessed prior to commencing underground operations. Stope mining i...s adopted based on ore body characteristics and geological features. Finite element numerical analysis, employing the Generalized Hoek–Brown criterion, evaluates slope stability for surface slopes and opening stopes. The pit design comprises a 70° slope angle, 20 m height, and 10–15 m safety berm, meeting stability requirements with a factor of safety of 2.46. Underground mining design includes a 62° ore body dip, a 50 m thick crown pillar to prevent surface subsidence, and 5 m wide, 5 m high stopes. Sill pillars are left for support after each level of excavation. Rock bolts are employed in specific stope areas where necessary, with continuous monitoring for surface deformation. This study analyzes the influence of stope sizes on the pit wall and pit bottom stability, identifying slope failures near the hanging wall close to the pit bottom during underground mining. A slight increase in the displacement zone is observed on the upper crest of the top footwall. Overall, the findings demonstrate successful stability in the transition from surface to underground mining at the Sepon Gold mine.続きを見る

本文ファイル

pdf 6795092 pdf 43.5 MB 68  

詳細

EISSN
レコードID
主題
タイプ
助成情報
登録日 2023.08.03
更新日 2023.10.10

この資料を見た人はこんな資料も見ています