<conference paper>
Plasma Current Ramp- Up in the Component Test Facility (CTF)

Creator
Language
Publisher
Date
Source Title
First Page
Last Page
Publication Type
Access Rights
Abstract Plasma current ramp-up in CTF has been studied by the heating power and vertical field without a central solenoid in the case of equal electron and ion temperature. For the fusion power of 150 MW, the... plasma current up to 12. 8 MA has been obtained by the 40 MW heating/current drive power. To maintain the steady state the more power of 64 MW is required because of no additional current drive capability supplied by the vertical field as in the transient phase. Steady state operation with the maximum neutron wall loading of 2 MW/m^2, much lower density than the Greenwald limit, and lower beta of 24 % than the present experimental value in CTF are attractive for developing ignition physics and fusion technology.show more

Hide fulltext details.

pdf 2005-電気学会研究会資料-CTF pdf 450 KB 286  

Details

Record ID
Peer-Reviewed
Subject Terms
NCID
Created Date 2015.11.10
Modified Date 2018.07.18

People who viewed this item also viewed