<紀要論文>
Estimation of Surface Runoff and Groundwater Infiltration Components by the Groundwater Recharge Model (Itoshima Area, Japan)

作成者
本文言語
出版者
発行日
収録物名
開始ページ
終了ページ
出版タイプ
アクセス権
関連DOI
関連URI
関連情報
概要 This paper presents the estimation of the parameters F_∞, and (r)_1/2 used in the groundwater recharge model by separating the surface runoff component for isolated rainfall event. The time-area distr...ibution method was used. Several types of land use were considered. The watershed of the upstream of Sakurai River at Suematsu Bridge in Itoshima Peninsula which includes the western part of the new campus (Ito campus) area of Kyushu University in southern Japan, was selected as a site study to test the model approach. Since more than 80% of study area is covered with forest, the proposed model considers rainfall interception by forest canopy. The runoff parameters F_∞, and (r)_1/2 were identified in this study using records of river discharge at the outlet point of the watershed. The results indicate that the separation approach satisfactorily predicted runoff parameters for different land use, and also showed that simulated runoff results agree well with observed results.続きを見る

本文ファイル

pdf paper2 pdf 4.98 MB 266  

詳細

レコードID
査読有無
主題
ISSN
NCID
タイプ
登録日 2009.04.22
更新日 2017.02.08

この資料を見た人はこんな資料も見ています